Solar power in India is a fast developing industry.
The country's solar installed capacity reached 25.21 GW as of 31 December 2018.[1][2]


The Indian government had an initial target of 20 GW capacity for 2022, which was achieved four years ahead of schedule.[3][4][5]
In 2015 the target was raised to 100 GW of solar capacity (including 40 GW from rooftop solar) by 2022, targeting an investment of US$100 billion.[6][7][8][9][10]


India expanded its solar-generation capacity 8 times from 2,650 MW on 26 May 2014 to over 20 GW as on 31 January 2018.[3][4]
The country added 3 GW of solar capacity in 2015-2016, 5 GW in 2016-2017 and over 10 GW in 2017-2018, with the average current price of solar electricity dropping to 18% below the average price of its coal-fired counterpart.[11][12][13]


Rooftop solar power accounts for 3.4 GW, of which 70% is industrial or commercial.[14]
In addition to its large-scale grid-connected solar PV initiative, India is developing off-grid solar power for local energy needs.[15]
Solar products have increasingly helped to meet rural needs; by the end of 2015 just under one million solar lanterns were sold in the country, reducing the need for kerosene.[16]
That year, 118,700 solar home lighting systems were installed and 46,655 solar street lighting installations were provided under a national program;[16] just over 1.4 million solar cookers were distributed in India.[16] In January 2019, Indian Railways announced the plan to install 4 GW capacity along its tracks.[17]


The International Solar Alliance (ISA), proposed by India as a founder member, is headquartered in India.




Contents






  • 1 National solar potential


  • 2 Indian initiative of International solar alliance


  • 3 Installations by region


    • 3.1 Installated cumulative national and state-wise capacity


    • 3.2 Andhra Pradesh


    • 3.3 Delhi


    • 3.4 Gujarat


    • 3.5 Haryana


    • 3.6 Karnataka


    • 3.7 Kerala


    • 3.8 Madhya Pradesh


    • 3.9 Maharashtra


    • 3.10 Rajasthan


    • 3.11 Tamil Nadu


    • 3.12 Telangana




  • 4 Electricity generation


  • 5 Major photovoltaic power stations


  • 6 Solar photovoltaic growth forecasts


  • 7 Solar thermal power


  • 8 Hybrid solar plants


  • 9 Solar heating


  • 10 Rural electrification


    • 10.1 Lamps and lighting


    • 10.2 Agricultural support


    • 10.3 Rainwater harvesting




  • 11 Refrigeration and air conditioning


  • 12 Grid stabilisation


  • 13 Challenges and opportunities


  • 14 Government support


    • 14.1 Solar PV tariff


    • 14.2 Incentives




  • 15 Solar-panel manufacturing


  • 16 See also


  • 17 References





National solar potential[edit]



With about 300 clear and sunny days in a year, the calculated solar energy incidence on India's land area is about 5000 trillion kilowatt-hours (kWh) per year (or 5 EWh/yr).[18][19] The solar energy available in a single year exceeds the possible energy output of all of the fossil fuel energy reserves in India. The daily average solar-power-plant generation capacity in India is 0.20 kWh per m2 of used land area, equivalent to 1400–1800 peak (rated) capacity operating hours in a year with available, commercially-proven technology.[20][21]



Indian initiative of International solar alliance[edit]



In January 2016, Prime Minister Narendra Modi and French President François Hollande laid the foundation stone for the headquarters of the International Solar Alliance (ISA) in Gwal Pahari, Gurgaon. The ISA will focus on promoting and developing solar energy and solar products for countries lying wholly or partially between the Tropic of Cancer and the Tropic of Capricorn. The alliance of over 120 countries was announced at the Paris COP21 climate summit.[22] One hope of the ISA is that wider deployment will reduce production and development costs, facilitating the increased deployment of solar technologies to poor and remote regions.



Installations by region[edit]



Installated cumulative national and state-wise capacity[edit]














































Installed solar PV on 31 March[23]
Year
Cumulative Capacity (in MW)
2010



161

2011



461

2012



1,205

2013



2,319

2014



2,632

2015



3,744

2016



6,763

2017



12,289

2018



21,651







































































































































































































































































































































Installed solar power capacity (MW)[1]
State
31 March 2015
31 March 2016
31 March 2017
31 December 2017[24]
Rajasthan 942.10 1,269.93 1,812.93 2,310.46
Punjab 185.27 405.06 793.95 905.64
Uttar Pradesh 71.26 143.50 336.73 550.38
Uttarakhand 5.00 41.15 233.49 246.89
Haryana 12.80 15.39 81.40 203.85
Delhi 5.47 14.28 40.27 58.02
Jammu and Kashmir 0.00 1.36 1.36 2.36
Chandigarh 4.50 6.81 17.32 18.89
Himachal Pradesh 0.00 0.73 0.73 1.48
Northern Region 3318.18

Gujarat 1,000.05 1,119.17 1,249.37 1,344.69
Maharashtra 360.75 385.76 452.37 763.08
Chhattisgarh 7.60 93.58 128.86 179.38
Madhya Pradesh 558.58 776.37 857.04 1,210.11
Dadra and Nagar Haveli 0.00 0.00 2.97 2.97
Goa 0.00 0.00 0.71 0.71
Daman and Diu 0.00 4.00 10.46 10.46

Western Region
2701.78

Tamil Nadu 142.58 1,061.82 1,691.83 1,819.42
Andhra Pradesh 137.85 572.97 1,867.23 2,165.21
Telangana 167.05 527.84 1,286.98 2,990.07
Kerala 0.03 13.05 74.20 88.20
Karnataka 77.22 145.46 1,027.84 1,800.85
Puducherry 0.20 0.20 0.08 0.11

Southern Region
5948.16

Bihar 0.00 5.10 108.52 141.52
Odisha 31.76 66.92 79.42 79.51
Jharkhand 16.00 16.19 23.27 23.37
West Bengal 7.21 7.77 26.14 39.84
Sikkim 0.00 0.00 0.00 0.01
Eastern Region 237.35

Assam 0.00 0.00 11.78 11.78
Tripura 5.00 5.00 5.09 5.09
Arunachal Pradesh 0.03 0.27 0.27 4.39
Mizoram 0.00 0.00 0.10 0.20
Manipur 0.00 0.00 0.03 1.33
Meghalaya 0.00 0.00 0.01 0.06
Nagaland 0.00 0.00 0.50 0.50
North Eastern Region 17.78

Andaman and Nicobar 5.10 5.10 6.56 12.61
Lakshadweep 0.75 0.75 0.75 0.75
Others 0.00 58.31 58.31 58.31
Islands and others 65.62

Total 3,743.97 6,762.85 12,288.83 17,052.37


Andhra Pradesh[edit]



Installed photovoltaic capacity in Andhra Pradesh is more than 2,590 MW as on 30 November 2018.[25] In 2015, NTPC agreed with APTransCo to install the 250-MW NP Kunta Ultra Mega Solar Power Project near Kadiri in Anantapur district.[26][27] In October 2017, 1000 MW was commissioned at Kurnool Ultra Mega Solar Park which has become the world's largest solar power plant at that time.[28] In August 2018, Greater Visakhapatnam commissioned a 2 MW grid-connected floating solar project which is largest operational floating solar PV project in India.[29]NTPC Simhadri is planning to install 25 MW floating solar PV plant on its water supply reservoir.[30] In February 2019, 200 MW was commissioned at Ananthapuram - II solar park located near Tadipatri.[31]



Delhi[edit]


Delhi being city state in India, has limitation in installing ground mounted solar power plants. However it is leading in roof top solar PV installations by adopting fully flexible net metering system.[32] The installed solar power capacity is 106 MW as on 30 September 2018.



Gujarat[edit]



Gujarat is one of India's most solar-developed states, with its total photovoltaic capacity reaching 1,637 MW by the end of January 2019.
Gujarat has been a leader in solar-power generation in India due to its high solar-power potential, availability of vacant land, connectivity, transmission and distribution infrastructure and utilities. According to a report by the Low Emission Development Strategies Global Partnership (LEDS GP) report, these attributes are complemented by political will and investment.[full citation needed] The 2009 Solar Power of Gujarat policy framework, financing mechanism and incentives have contributed to a green investment climate in the state and targets for grid-connected solar power.[33][34]


The state has commissioned Asia's largest solar park near the village of Charanka in Patan district.[35] The park is generating 345 MW by March 2016 of its 500 MW total planned capacity and has been cited as an innovative and environmentally-friendly project by the Confederation of Indian Industry.[full citation needed] In December 2018, 700 MW Solar PV plant at Raghanesda Solar Park is contracted at 2.89 Rs/unit levelised tariff.[36]


To make Gandhinagar a solar-power city, the state government has begun a rooftop solar-power generation scheme. Under the scheme, Gujarat plans to generate 5 MW of solar power by putting solar panels on about 50 state-government buildings and 500 private buildings.


It also plans to generate solar power by putting solar panels along the Narmada canals. As part of this scheme, the state has commissioned the 1 MW Canal Solar Power Project on a branch of the Narmada Canal near the village of Chandrasan in Mehsana district. The pilot project is expected to stop 90,000 litres (24,000 US gal; 20,000 imp gal) of water per year from evaporating from the Narmada River.



Haryana[edit]


State has set the 4.2 GW solar power (including 1.6 GW solar root top) target by 2022 as it is has high potential since it has at least 330 sunny days. Haryana is one of the fastets growign state in terms of solar energy with installed and commissioned capacity of 73.27MW. Out of this, 57.88MW was commissioned in FY 2016/17.. Haryana solar power policy announced in 2016 offers 90% subsidy to farmers for the solar powered water pumps, which also offers subsidy for the solar street lighting, home lighting solutions, solar water heating schemes, solar cooker schemes. It is mandatory for new residential buildings larger than 500 sq. yards to install 3% to 5% solar capacity for no building plan sanctioning is required, and a loan of upto Rs. 10 lacs is made available to the residential property owners. Haryana provide 100% waiver of electricity taxes, cess, electricity duty, wheeling charges, cross subsidy charges, transmission and distribution charges, etc for rooftop solar projects.[37]


In december 2018, Haryana had installed solar capacity of 48.80 MW,[38] and in January 2019 Haryana floated tender for 300 MW grid-connected solar power,[39] and additional 16 MW tender for the canal top solar power.[40]



Karnataka[edit]


Karnataka is the top solar state in India exceeding 5,000 MW installed capacity by the end of financial year 2017-18.[41] The installed capacity of Pavagada Solar Park is 600 MW and its ultimate 2,000 MW installed capacity is expected by the end of year 2020.



Kerala[edit]


Kerala's largest floating solar power plant was set upon the Banasura Sagar Dam reservoir in Wayanad district, Kerala. The 500 kW (kilowatt peak) solar plant of the Kerala state electricity board (KSEB) floats on 1.25 acres of the water surface of the reservoir. The solar plant has 1,938 solar panels which have been installed on 18 Ferro cement floaters with hollow insides.[42]



Madhya Pradesh[edit]


Madhya Pradesh is one of India's most solar-developed states, with its total photovoltaic capacity reaching 1,117 MW by the end of July 2017. The Welspun Solar MP project, the largest solar-power plant in the state, was built at a cost of 1,100 crore (US$150 million) on 305 ha (3.05 km2) of land and will supply power at 8.05 (11¢ US) per kWh. A 130 MW solar power plant project at Bhagwanpura, a village in Neemuch district, was launched by Prime Minister Narendra Modi. It is the largest solar producer, and Welspun Energy is one of the top three companies in India's renewable-energy sector.[43]
A planned 750 MW solar-power plant in Rewa district is also planned and expected to be completed in 2018. This is developing by Rewa Ultra Mega Solar Limited.[44][better source needed]



Maharashtra[edit]


The 125-MW Sakri solar plant is the largest solar-power plant in Maharashtra. The Shri Saibaba Sansthan Trust has the world's largest solar steam system. It was constructed at the Shirdi shrine at an estimated cost of 1.33 crore (US$190,000), 58.4 lakh (US$81,000) which was paid as a subsidy by the renewable-energy ministry. The system is used to cook 50,000 meals per day for pilgrims visiting the shrine, resulting in annual savings of 100,000  kg of cooking gas, and was designed to generate steam for cooking even in the absence of electricity to run the circulating pump. The project to install and commission the system was completed in seven months, and the system has a design life of 25 years.[45][46][47] The Osmanabad region in Maharashtra has abundant sunlight, and is ranked the third-best region in India in solar insolation. A 10 MW solar power plant in Osmanabad was commissioned in 2013. The total power capacity of Maharashtra is about 500 MW.



Rajasthan[edit]


Rajasthan is one of India's most solar-developed states, with its total photovoltaic capacity reaching 2289 MW by end of June 2018. Rajasthan is also home to the worlds largest Fresnel type 125 MW CSP plant at the Dhirubhai Ambani Solar Park.[11][48]Jodhpur district leads the state with installed capacity of over 1,500 MW, followed by Jaisalmer and Bikaner.


The Bhadla Solar Park, with a total ultimate capacity of 2,255 MW, is being developed in four phases of which 260 MW capacity was commissioned by NTPC Limited. Total installed capacity at the end of June 2018 is 745 MW and the remaining capacity is expected to be commissioned by March 2019. In September 2018 Acme Solar announced that it had commissioned India's cheapest solar power, 200 MW at Bhadla
[49].


The only tower type solar thermal power plant (2.5 MW) in India is located in Bikaner district.[50]


In March 2019, The lowest tariff in India is ₹2.48/kWh for installing the 750 MW solar power plants in the state.[51]



Tamil Nadu[edit]


Tamil Nadu has the 5th highest operating solar-power capacity in India in May 2018. The total operating capacity in Tamil Nadu is 1,8 GW.[41] On 1 July 2017, Solar power tariff in Tamil Nadu has hit an all-time low of Rs 3.47 per unit when bidding for 1500 MW capacity was held.[52][53]


The 648-MW Kamuthi Solar Power Project is the biggest operating project in the state. On 1 January 2018, NLC India Limited (NCIL) commissioned a new 130 MW solar power project in Neyveli.[54]



Telangana[edit]


Telangana ranks second when it comes to solar energy generation capacity in India. The state is trailing behind Karnataka with a solar power generation capacity of 3400 MW and plans to achieve a capacity of 5000 MW by 2022.[55]NTPC Ramagundam is planning to install 120 MW floating solar PV plant on its water supply reservoir.[56]



Electricity generation[edit]


Grid-connected solar electricity generation has reached nearly 2% of total utility electricity generation.[57] Solar generation meets the daytime peak load in non-monsoon months when electricity spot prices exceed the daily average price.[58]






























Annual solar power generation
Year
Solar power generation (TWh)
2013-14



3.35

2014-15



4.60

2015-16



7.45

2016-17



12.09

2017-18



25.87







































































































































Monthly solar power generation in India, April 2017 - March 2018
Month
Regional solar power generation (GWh)[59]
Total (GWh)[60]
North West South East North East
April 2017 458.76 419.26 833.47 40.16 0.99 1,752.74
May 2017 528.92 426.05 935.51 39.72 1.17 1,931.30
June 2017 489.02 399.95 871.08 36.36 0.92 1,803.35
July 2017 461.40 282.92 886.69 27.17 0.98 1,661.29
August 2017 504.42 363.99 765.21 30.43 1.17 1,660.26
September 2017 547.08 438.70 974.52 32.84 0.94 2,002.51
October 2017 608.61 456.16 1,069.60 33.31 1.11 2,186.00
November 2017 518.77 489.30 1,083.92 19.27 1.32 2,094.59
December 2017 483.35 465.63 1242.36 31.49 3.35 2,242.64
January 2018 - - - - - 2,547.77
February 2018 548.61 546.80 1,530.38 35.23 0.98 2,677.10
March 2018 685.27 703.39 1,872.31 49.26 1.29 3,311.53
Total (GWh) - - - - - 25,871.08


Major photovoltaic power stations[edit]


Below is a list of solar power generation facilities with a capacity of at least 10 MW.


















































































































































































































Major photovoltaic (PV) power plants
Plant State DC peak power (MW) Commissioned
Kamuthi Solar Power Project Tamil Nadu 648
21 September 2016[61]

Gujarat Solar Park-1[62]
Gujarat 221
April 2012

Welspun Solar MP project[63]
Madhya Pradesh 151
February 2014

ReNew Power, Nizamabad
Telangana 143
15 April 2017[64]
Sakri solar plant Maharashtra 125
March 2013

NTPC solar plants[65]
110
2015
Maharashtra I Maharashtra 67
2017
Green Energy Development Corporation (GEDCOL)[66]
Odisha 50
2014
Tata Power Solar Systems (TPS), Rajgarh[67]
Madhya Pradesh 50
March 2014

Welspun Energy, Phalodhi[68]
Rajasthan 50
March 2013
Jalaun Solar Power Project Uttar Pradesh 50
27 January 2016
GEDCOL[69]
Odisha 48
2014
Karnataka I Karnataka 40
2018

Bitta Solar Power Plant[70]
Gujarat 40
January 2012

Dhirubhai Ambani Solar Park, Pokhran[71]
Rajasthan 40
April 2012
Rajasthan Photovoltaic Plant[72]
Rajasthan 35
February 2013
Welspun, Bathinda[73]
Punjab 34
August 2015

Moser Baer, Patan district[74]
Gujarat 30
October 2011
Lalitpur Solar Power Project[75]
Uttar Pradesh 30
2015

Mithapur Solar Power Plant[76]
Gujarat 25
25 January 2012
GEDCOL[77]
Odisha 20
2014
Kadodiya Solar Park Madhya Pradesh 15
2014
Telangana I Telangana 12
2016
Telangana II Telangana 12
2016
NTPC Odisha 10
2014
Sunark Solar Odisha 10
2011
RNS Infrastructure Limited, Pavagada Karnataka 10
2016
Bolangir Solar Power Project Odisha 10
2011
Azure Power, Sabarkantha[78][79]
Gujarat 10
June 2011

Green Infra Solar Energy, Rajkot[80][81]
Gujarat 10
November 2011
Waa Solar Power Plant, Surendranagar[82]
Gujarat 10
December 2011
Sharda Construction, Latur[83]
Maharashtra 10
June 2015
Ushodaya Project, Midjil
Telangana 10
December 2013




Solar photovoltaic growth forecasts[edit]


In August 2016, the forecast for solar photovoltaic installations was about 4.8 GW for the calendar year. About 2.8 GW was installed in the first eight months of 2016, more than all 2015 solar installations. India's solar projects stood at about 21 GW, with about 14 GW under construction and about 7 GW to be auctioned.[84] The country's solar capacity reached 19.7 GW by the end of 2017, making it the third-largest global solar market.[85]


In mid-2018 the Indian power minister RK Singh flagged a tender for a 100GW solar plant at an event in Delhi, while discussing a 10GW tender due to be issued in July that year (at the time, a world record). He also increased the government target for installed renewable energy by 2022 to 227GW.[86]



Solar thermal power[edit]




Solar thermal power plant with a field of heliostats and a central solar power tower.


The installed capacity of commercial solar thermal power plants (non storage type) in India is 227.5 MW with 50 MW in Andhra Pradesh and 177.5 MW in Rajasthan.[87][88]
Solar thermal plants with thermal storage are emerging as cheaper (US 6.1 ¢/kWh or Rs 3.97/KWh) and clean load following power plants to supply electricity round the clock,[89][90] working as dispatchable generation.[91]
Proper mix of solar thermal (thermal storage type) and solar PV can fully match the load fluctuations without the need of costly battery storage.[92][93]


The existing solar thermal power plants (non-storage type) in India, which are generating costly intermittent power on daily basis, can be converted into storage type solar thermal plants to generate 3 to 4 times more baseload power at cheaper cost and not depend on government subsidies.[94]



Hybrid solar plants[edit]


Solar power, generated mainly during the daytime in the non-monsoon period, complements wind which generate power during the monsoon months in India.[95] Solar panels can be located in the space between the towers of wind-power plants.[96] It also complements hydroelectricity, generated primarily during India's monsoon months. Solar-power plants can be installed near existing hydropower and pumped-storage hydroelectricity, utilizing the existing power transmission infrastructure and storing the surplus secondary power generated by the solar PV plants.[97][98]


During the daytime, the additional auxiliary power consumption of a solar thermal storage power plant is nearly 10% of its rated capacity for the process of extracting solar energy in the form of thermal energy.[91] This auxiliary power requirement can be made available from cheaper solar PV plant by envisaging hybrid solar plant with a mix of solar thermal and solar PV plants at a site. Also to optimise the cost of power, generation can be from the cheaper solar PV plant (33% generation) during the daylight whereas the rest of the time in a day is from the solar thermal storage plant (67% generation from Solar power tower and parabolic trough types) for meeting 24 hours baseload power.[99] When solar thermal storage plant is forced to idle due to lack of sunlight locally during cloudy days in monsoon season, it is also possible to consume (similar to a lesser efficient, huge capacity and low cost battery storage system) the cheap excess grid power when the grid frequency is above 50 hz for heating the hot molten salt to higher temperature for converting stored thermal energy in to electricity during the peak demand hours when the electricity sale price is profitable.[100][101]



Solar heating[edit]




Array of parabolic troughs.



Generating hot water or air or steam using concentrated solar reflectors, is increasing rapidly. Presently concentrated solar thermal installation base for heating applications is about 20 MWth in India and expected to grow rapidly.[102][103]Cogeneration of steam and power round the clock is also feasible with solar thermal CHP plants with storage capacity.


Bengaluru has the largest deployment of roof-top solar water heaters in India, generating an energy equivalent of 200 MW.[104] It is India's first city to provide a rebate of 50 (70¢ US) on monthly electricity bills for residents using roof-top thermal systems,[105] which are now mandatory in all new structures. Pune has also made solar water heaters mandatory in new buildings.[106]Photovoltaic thermal (PVT) panels produce simultaneously the required warm water/air along with electricity under sunlight.[107]



Rural electrification[edit]


The lack of an electricity infrastructure is a hurdle to rural India's development. India's power grid is under-developed, with large groups of people still living off the grid.[108] In 2004, about 80,000 of the nation's villages still did not have electricity; of them, 18,000 could not be electrified by extending the conventional grid. A target of electrifying 5,000 such villages was set for the 2002–2007 Five-Year Plan. By 2004 more than 2,700 villages and hamlets were electrified, primarily with solar photovoltaic systems.[18] The development of inexpensive solar technology is considered a potential alternative, providing an electricity infrastructure consisting of a network of local-grid clusters with distributed electricity generation.[109] It could bypass (or relieve) expensive, long-distance, centralized power-delivery systems, bringing inexpensive electricity to large groups of people. In Rajasthan during FY2016-17, 91 villages have been electrified with a solar standalone system and over 6,200 households have received a 100W solar home-lighting system.[citation needed]


India has sold or distributed about 1.2 million solar home-lighting systems and 3.2 million solar lanterns, and has been ranked the top Asian market for solar off-grid products.[110][111][112][113]



Lamps and lighting[edit]


By 2012, a total of 4,600,000 solar lanterns and 861,654 solar-powered home lights were installed. Typically replacing kerosene lamps, they can be purchased for the cost of a few months' worth of kerosene with a small loan. The Ministry of New and Renewable Energy is offering a 30- to 40-percent subsidy of the cost of lanterns, home lights and small systems (up to 210 Wp).[114] Twenty million solar lamps are expected by 2022.[115]



Agricultural support[edit]


Solar photovoltaic water-pumping systems are used for irrigation and drinking water.[116] Most pumps are fitted with a 200–3,000 W (0.27–4.02 hp) motor powered with a 1,800 Wp PV array which can deliver about 140,000 litres (37,000 US gal) of water per day from a total hydraulic head of 10 m (33 ft). By 30 September 2006 a total of 7,068 solar photovoltaic water pumping systems were installed,[109] and 7,771 were installed by March 2012.[117] During hot sunny daytime when the water needs are more for watering the fields, solar pumps performance can be improved by maintaining pumped water flowing/sliding over the solar panels to keep them cooler and clean.[118] Solar driers are used to dry harvests for storage.[119] Low cost solar powered bicycles are also available to ply between fields and village for agricultural activity, etc.[120]



Rainwater harvesting[edit]


In addition to solar energy, rainwater is a major renewable resource of any area.
In India, large areas are being covered by solar PV panels every year.
Solar panels can also be used for harvesting most of the rainwater falling on them and drinking-quality water, free from bacteria and suspended matter, can be generated by simple filtration and disinfection processes, as rainwater is very low in salinity.[121][122]
Good quality water resources, closer to populated areas, are becoming a scarcity and increasingly costly for consumers.
Exploitation of rainwater for value-added products like bottled drinking water makes solar PV power plants profitable even in high rainfall and cloudy areas by the increased income from drinking water generation.[123]



Refrigeration and air conditioning[edit]



Many solar panels arranged horizontally at ground level

4 MW horizontal single-axis tracker in Vellakoil, Tamil Nadu


Thin-film solar cell panels offer better performance than crystalline silica solar panels in tropical hot and dusty places like India; there is less deterioration in conversion efficiency with increased ambient temperature, and no partial shading effect. These factors enhance the performance and reliability (fire safety) of thin-film panels.[124][125][126] Maximum solar-electricity generation during the hot hours of the day can be used for meeting residential air-conditioning requirements regardless of other load requirements, such as refrigeration, lighting, cooking and water pumping. Power generation of photovoltaic modules can be increased by 17 to 20 percent by equipping them with a tracking system.[127][128]


Residential electricity consumers who are paying higher slab rates more than 5 (7.0¢ US) per unit, can form in to local groups to install collectively roof top off-grid solar power units (without much battery storage) and replace the costly power used from the grid with the solar power as and when produced.[129] Hence power drawl from the grid which is an assured power supply without much power cuts nowadays, serves as cheaper back up source when grid power consumption is limited to lower slab rate by using solar power during the day time. The maximum power generation of solar panels during the sunny daytime is complementary with the enhanced residential electricity consumption during the hot/summer days due to higher use of cooling appliances such as fans, refrigerators, air conditioners, desert coolers, etc. It would discourage the Discoms to extract higher electricity charges selectively from its consumers.[130] There is no need of any permission from Discoms similar to DG power sets installation. Cheaper discarded batteries of electric vehicle can also be used economically to store the excess solar power generated in the daylight.[131]



Grid stabilisation[edit]



Solar-power plants equipped with battery-storage systems where net energy metering is used can feed stored electricity into the power grid when its frequency is below the rated parameter (50 Hz) and draw excess power from the grid when its frequency is above the rated parameter.[132] Excursions above and below the rated grid frequency occur about 100 times daily.[133][134] The solar-plant owner would receive nearly double the price for electricity sent into the grid compared to that consumed from the grid if a frequency-based tariff is offered to rooftop solar plants or plants dedicated to a distribution substation.[135][136] A power-purchase agreement (PPA) is not needed for solar plants with a battery storage system to serve ancillary-service operations and transmit generated electricity for captive consumption using an open-access facility.[137][138] Battery storage is popular in India, with more than 10 million households using battery backup during load shedding.[139] Battery storage systems are also used to improve the power factor.[140] Solar PV or wind paired with four-hour battery storage systems is already cost competitive, without subsidy, as a source of dispatchable generation compared with new coal and new gas plants in India”.[141]


Battery storage is also used economically to reduce daily/monthly peak power demand for minimising the monthly demand charges from the utility to the commercial and industrial establishments.[142] Construction power tariffs are very high in India.[143] Construction power needs of long gestation mega projects can be economically met by installing solar PV plants for permanent service in the project premises with or without battery storage for minimising use of Standby generator sets or costly grid power.[144]



Challenges and opportunities[edit]



The land is scarce in India, and per-capita land availability is low[citation needed]. Dedication of land for the installation of solar arrays must compete with other needs. The amount of land required for utility-scale solar power plants is about 1 km2 (250 acres) for every 40–60 MW generated. One alternative is to use the water-surface area on canals, lakes, reservoirs, farm ponds and the sea for large solar-power plants.[145][146][147] These water bodies can also provide water to clean the solar panels.[148] Highways and railways may also avoid the cost of land nearer to load centres, minimising transmission-line costs by having solar plants about 10 meters above the roads or rail tracks.[149] Solar power generated by road areas may also be used for in-motion charging of electric vehicles, reducing fuel costs.[150] Highways would avoid damage from rain and summer heat, increasing comfort for commuters.[151][152][153]


The architecture best suited to most of India would be a set of rooftop power-generation systems connected via a local grid.[154] Such an infrastructure, which does not have the economy of scale of mass, utility-scale solar-panel deployment, needs a lower deployment price to attract individuals and family-sized households. Photovoltaics are projected to continue their cost reductions, becoming able to compete with fossil fuels.[155][156]


Greenpeace[18][157][158] recommends that India adopt a policy of developing solar power as a dominant component of its renewable-energy mix, since its identity as a densely-populated country[159] in the tropical belt[160][161] of the subcontinent has an ideal combination of high insolation[160] and a large potential consumer base.[162][163][164] In one scenario[158] India could make renewable resources the backbone of its economy by 2030, curtailing carbon emissions without compromising its economic-growth potential.[165] A study suggested that 100 GW of solar power could be generated through a mix of utility-scale and rooftop solar, with the realizable potential for rooftop solar between 57 and 76 GW by 2024.[166]


During the 2015-16 fiscal year NTPC, with 110 MW solar power installations, generated 160.8 million kWh at a capacity utilisation of 16.64 percent (1,458 kWh per kW)—more than 20 percent below the claimed norms of the solar-power industry.[65]


It is considered prudent to encourage solar-plant installations up to a threshold (such as 7,000 MW) by offering incentives.[167] Otherwise, substandard equipment with overrated nameplate capacity may tarnish the industry.[168][169] The purchaser, transmission agency and financial institution should require capacity utilisation and long-term performance guarantees for the equipment backed by insurance coverage in the event that the original equipment manufacturer ceases to exist.[170][171][172] Alarmed by the low quality of equipment, India issued draft quality guide lines in May 2017 to be followed by the solar plant equipment suppliers conforming to Indian standards.[173][174][175]



Government support[edit]




Solar power in India is located in India
Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India

Solar power in India



Solar radiation resource assessment stations in India


Fifty-one solar radiation resource assessment stations have been installed across India by the Ministry of New and Renewable Energy (MNRE) to create a database of solar-energy potential. Data is collected and reported to the Centre for Wind Energy Technology (C-WET) to create a solar atlas. In June 2015, India began a 40 crore (US$5.6 million) project to measure solar radiation with a spatial resolution of 3 by 3 kilometres (1.9 mi × 1.9 mi). This solar-radiation measuring network will provide the basis for the Indian solar-radiation atlas. According to National Institute of Wind Energy officials, the Solar Radiation Resource Assessment wing (121 ground stations) would measure solar radiation's three parameters—Global Horizontal Irradiance (GHI), Direct Normal Irradiance (DNI) and Diffuse Horizontal Irradiance (DHI)—to accurately measure a region's solar radiation.[176][177]


The Indian government is promoting solar energy. It announced an allocation of 1,000 crore (US$140 million) for the Jawaharlal Nehru National Solar Mission and a clean-energy fund for the 2010-11 fiscal year, an increase of 380 crore (US$53 million) from the previous budget. The budget encouraged private solar companies by reducing the import duty on solar panels by five percent. This is expected to reduce the cost of a rooftop solar-panel installation by 15 to 20 percent.



Solar PV tariff[edit]



Bar graph

Price of silicon solar cells since 1977. The great thing about solar power is that it is a technology and not a fuel. It is unlimited and the more it is deployed the cheaper it would be. While the more limited fossil fuels are used, the more expensive they become.[178][179]


The average bid in reverse auctions in April 2017 is 3.15 (4.4¢ US) per kWh, compared with 12.16 (17¢ US) per kWh in 2010, which is around 73% drop over the time window.[180][181][182] The current prices of solar PV electricity is around 18% lower than the average price for electricity generated by coal-fired plants.[13] By the end of 2018, competitive reverse auctions, falling panel and component prices, the introduction of solar parks, lower borrowing costs and large power companies have contributed to the fall in prices.[183] The cost of solar PV power in India, China, Brazil and 55 other emerging markets fell to about one-third of its 2010 price, making solar the cheapest form of renewable energy and cheaper than power generated from fossil fuels such as coal and gas.[184]


The levelized cost of solar PV electricity fell below 1.77¢ US per kWh in November 2017, cheaper than fuel cost of any pit head coal-based power plants in India.[185][186] The intermittent / non-dispatchable solar PV at the prevailing low tariffs clubbed with Pumped-heat electricity storage can offer cheapest dispatchable power round the clock on demand.


The Indian government has reduced the solar PV power purchase price from the maximum allowed 4.43 (6.2¢ US) per KWh to 4.00 (5.6¢ US) per KWh, reflecting the steep fall in cost of solar power-generation equipment.[187][188][189] The applicable tariff is offered after applying viability gap funding (VGF) or accelerated depreciation (AD) incentives.[190][191] In January 2019, the time period for commissioning the solar power plants is reduced to 18 months for units located outside the solar parks and 15 months for units located inside the solar parks from the date of power purchase agreement.[192]


Solar PV generation cost fell to 2.97 (4.1¢ US) per kWh for the 750 MW Rewa Ultra Mega Solar power project, India's lowest electricity-generation cost.[193][194]Solar panel prices are lower than those of mirrors by unit area.[116][195]


In an auction of 250 MW capacity of the second phase in Bhadla solar park, South Africa's Phelan Energy Group and Avaada Power were awarded 50 MW and 100 MW of capacity respectively in May 2017 at 2.62 (3.6¢ US) per kilowatt hour.[196] The tariff is also lower than NTPC's average coal power tariff of 3.20 per kilowatt hour. SBG Cleantech, a consortium of Softbank Group, Airtel and Foxconn, was awarded the remaining 100 MW capacity at a rate of 2.63 (3.7¢ US) per kWh.[197][198] Few days later in a second auction for another 500 MW at the same park, solar tariff has further fallen to 2.44 (3.4¢ US) per kilowatt hour which are the lowest tariffs for any solar power project in India.[199] These tariffs are lower than traded prices for day time in non-monsoon period in IEX and also for meeting peak loads on daily basis by using cheaper solar PV power in pumped-storage hydroelectricity stations indicating there is no need of any power purchase agreements and any incentives for the solar PV power plants in India.[200][201][58] Solar PV power plant developers are forecasting that solar power tariff would drop to 1.5 (2.1¢ US) /unit in near future.[202][203]


The lowest solar tariff in May 2018 is Rs 2.71/kWh (without incentives) which is less than the tariff of Badla solar park (2.44 (3.4¢ US) per kWh with VGF incentive) after the clarification that any additional taxes are pass through cost with hike in the tariff.[204][205] In early July 2018 bids, the lowest solar PV tariff has touched 2.44 (3.4¢ US) per kWh without VGF incentive.[206][207] In February 2019, The lowest tariff is ₹2.55/kWh for feeding in to the high voltage interstate transmission system (ISTS).[208]


The tariff for roof top installations are also falling with the recent offer of 3.64 (5.1¢ US) with 100% locally made components.[209]


In February 2019, the lowest solar power tariff is 1.24 (1.7¢ US) per kWh for 50 MW contracted capacity at Pavagada Solar Park.[210]



Incentives[edit]



Colour-coded world map


Grid parity for solar PV systems around the world[211]
  Reached grid-parity before 2014
  Reached grid-parity after 2014
  Reached grid-parity after 2016
  U.S. states poised to reach grid-parity soon


At the end of July 2015, the chief incentives were:



  1. Viability Gap Funding: Under the reverse bidding process, bidders who need least viability gap funding at the reference tariff (RS 4.93 per unit in 2016) is selected.[212]. Funding was Rs 1 Crore/MW for open projects on average in 2016.

  2. Accelerated depreciation: For profit-making enterprises installing rooftop solar systems, 40 percent of the total investment could be claimed as depreciation in the first year (decreasing taxes).

  3. To protect the local solar panel manufacturers, 25% safe guard duty is imposed for two years period from August 2018 on the imports from China & Malaysia who are suspected of dumping solar panels in to India.[213]

  4. Capital subsidies were applicable to rooftop solar-power plants up to a maximum of 500 kW. The 30-percent subsidy was reduced to 15 percent.

  5. Renewable Energy Certificates (RECs): Tradeable certificates providing financial incentives for every unit of green power generated.[214]


  6. Net metering incentives depend on whether a net meter is installed and the utility's incentive policy. If so, financial incentives are available for the power generated.[215]

  7. Assured Power Purchase Agreement (PPA): The power-distribution and -purchase companies owned by state and central governments guarantee the purchase of solar PV power when produced only during daylight. The PPAs offer fair market determined tariff for the solar power which is a secondary power or negative load and an intermittent energy source on a daily basis.

  8. Interstate transmission system (ISTS) charges and losses are not levied during the period of PPA for the projects commissioned before 31 March 2022.[216]

  9. Union government offers 70% and 30% subsidy for the hill states and other states respectively for the installation of roof top solar units.[14] Additional incentives are offered to roof top solar power plants from various state governments.[217][218]



Solar-panel manufacturing[edit]


The 2018 manufacturing capacity of solar cells and solar modules in India was 1,590 MW and 5,620 MW, respectively.[219] Except for crystalline silicon wafers or cadmium telluride photovoltaics or Float-zone silicon, nearly 80 percent of solar-panel weight is flat glass.[220] One hundred to 150 tons of flat glass is used to manufacture a one-MW solar panel. Low-iron flat or float glass is manufactured from soda ash and iron-free silica. Soda-ash manufacturing from common salt is an energy-intensive process if it is not extracted from soda lakes or glasswort cultivation in alkali soil. To increase installation of photovoltaic solar-power plants, the production of flat glass and its raw materials must expand commensurately to eliminate supply constraints or future imports.[221]


For utility scale solar projects, top solar module suppliers in 2016-17 were: Trina Solar, JA Solar, Canadian Solar, Risen, Hanwha and GCL Poly.[222]
For rooftop solar projects, international companies with the largest market share in the Indian market were: Trina Solar, Canadian Solar, Renesola, REC Solar and Jinko Solar.[223] Similarly, top Indian suppliers were: Vikram Solar, Waaree, Adani, Emmvee and Jakson.[224]



See also[edit]




  • Renewable energy in India

  • Electricity sector in India

  • Energy policy of India

  • Wind power in India

  • Biofuels in India

  • Hydroelectric power in India

  • Growth of photovoltaics

  • Jawaharlal Nehru National Solar Mission

  • List of solar power stations in India

  • List of photovoltaic power stations

  • Index of solar energy articles




References[edit]





  1. ^ ab "Physical Progress (Achievements)". Ministry of New & Renewable Energy. Retrieved 18 July 2018..mw-parser-output cite.citation{font-style:inherit}.mw-parser-output .citation q{quotes:"""""""'""'"}.mw-parser-output .citation .cs1-lock-free a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/6/65/Lock-green.svg/9px-Lock-green.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-limited a,.mw-parser-output .citation .cs1-lock-registration a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/d/d6/Lock-gray-alt-2.svg/9px-Lock-gray-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .citation .cs1-lock-subscription a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/a/aa/Lock-red-alt-2.svg/9px-Lock-red-alt-2.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration{color:#555}.mw-parser-output .cs1-subscription span,.mw-parser-output .cs1-registration span{border-bottom:1px dotted;cursor:help}.mw-parser-output .cs1-ws-icon a{background:url("//upload.wikimedia.org/wikipedia/commons/thumb/4/4c/Wikisource-logo.svg/12px-Wikisource-logo.svg.png")no-repeat;background-position:right .1em center}.mw-parser-output code.cs1-code{color:inherit;background:inherit;border:inherit;padding:inherit}.mw-parser-output .cs1-hidden-error{display:none;font-size:100%}.mw-parser-output .cs1-visible-error{font-size:100%}.mw-parser-output .cs1-maint{display:none;color:#33aa33;margin-left:0.3em}.mw-parser-output .cs1-subscription,.mw-parser-output .cs1-registration,.mw-parser-output .cs1-format{font-size:95%}.mw-parser-output .cs1-kern-left,.mw-parser-output .cs1-kern-wl-left{padding-left:0.2em}.mw-parser-output .cs1-kern-right,.mw-parser-output .cs1-kern-wl-right{padding-right:0.2em}


  2. ^ "Share of Solar Rises to 7.46% of India's Total Installed Power Capacity". Retrieved 18 October 2018.


  3. ^ ab "Achieving 2022 target four years ahead of schedule". Retrieved 2018-02-04.


  4. ^ ab "India hits 20 GW solar capacity milestone". Retrieved 4 February 2018.


  5. ^ Chandra, Yogender Pal; Singh, Arashdeep; Kannojiya, Vikas; Kesari, J. P. (2018). "Solar Energy a Path to India's Prosperity". Journal of the Institution of Engineers (India): Series C. doi:10.1007/s40032-018-0454-6.


  6. ^ Government looking at 100,000 MW solar power by 2022


  7. ^ Krishna N. Das (2015-01-02). "India's Modi raises solar investment target to $100 bln by 2022". Reuters. Retrieved 2015-01-02.


  8. ^ "India releases state targets for 40GW rooftop solar by 2022". Retrieved 2016-07-29.


  9. ^ "State-wise break-up of solar power target by the year 2022" (PDF). Retrieved 11 August 2016.


  10. ^ "Government working to double generation target from solar parks". The Economic Times. Economic Times. 2016-07-18. Retrieved 2016-07-18.


  11. ^ ab "India's solar capacity to cross 20GW in next 15 months: Piyush Goyal". Economic Times. Retrieved 2017-04-06.


  12. ^ "US's Paris climate deal exit may lower India's solar power tariffs further". Retrieved 2017-06-16.


  13. ^ ab McGrath, Matt (2017-06-01). "Five effects of a US pull-out from Paris climate deal". BBC. Retrieved 2017-06-01.


  14. ^ ab "Renewable energy in India: why rooftop remains the most untapped solar source". Retrieved 18 January 2019.


  15. ^ "Solar water pumps can help India surpass 100 GW target: Report". Retrieved 2 August 2017.


  16. ^ abc "Ministry of New and Renewable Energy, Annual Report 2015-2016". Retrieved 2017-04-21.


  17. ^ Indian Railways to invest Rs 18,000 crore on solar power units along tracks, Financial Express, 19 January 2019.


  18. ^ abc Muneer, T.; Asif, M.; Munawwar, S. (2005). "Sustainable production of solar electricity with particular reference to the Indian economy". Renewable and Sustainable Energy Reviews. 9 (5): 444. doi:10.1016/j.rser.2004.03.004. (publication archived in ScienceDirect, needs subscription or access via university)


  19. ^ "Solar". Ministry of New and Renewable Energy, Govt. of India. Retrieved 2014-02-21.


  20. ^ "How to calculate the annual solar energy output of a photovoltaic system?". Retrieved 2017-06-30.


  21. ^ "Comprehensive technical data of PV modules". Retrieved 2015-02-21.


  22. ^ Neslen, Arthur (2015-12-04). "India Unveils Global Solar Alliance of 120 Countries at Paris Climate Summit". AlterNet. Retrieved 2016-08-06.


  23. ^ "All India installed capacity of power stations" (PDF). March 2018. Retrieved 16 April 2018.


  24. ^ "Commissioning Status of Grid Connected Solar Projects" (PDF). Ministry of New and Renewable Energy, Govt. of India. Retrieved 24 October 2018.


  25. ^ "Salient features of A.P.TRANSCO / A.P.GENCO / DISCOMS" (PDF). Retrieved 24 February 2019.


  26. ^ India, Press Trust of (2016-05-10). "Power generation begins at Kunta ultra mega solar project". Business Standard India. Retrieved 2016-05-11.


  27. ^ "NTPC signs PPA for phase 1 of 1,000 mw ultra solar project with AP discoms". Retrieved 2014-06-23.


  28. ^ "The World's Largest Solar Park - Kurnool, India". Retrieved 1 November 2017.


  29. ^ "Floating Solar Tender of 15 MW Announced by Greater Visakhapatnam Smart City". Retrieved 24 December 2018.


  30. ^ "NTPC's New 25 MW Floating Solar Project Tender in Andhra Pradesh". Retrieved 19 December 2018.


  31. ^ "Solar plant commissioned". Retrieved 20 February 2019.


  32. ^ "Delhi: Multiple consumers can benefit from a single solar plant at one location". Retrieved 18 December 2018.


  33. ^ "Pioneering and scaling up solar energy in India – webinar and related resources". The Low Emission Development Strategies Global Partnership.


  34. ^ "Gujarat government buys solar power at Rs 15 per unit from 38 firms". 2017-03-04. Retrieved 2017-03-05.


  35. ^ "Charanka Solar Park" (pdf). Ministry of New and Renewable Energy.


  36. ^ "Foreign players sweep Gujarat solar auction". Retrieved 22 December 2018.


  37. ^ Haryana solar energy policy overview, itsmysun.com, 2016.


  38. ^ DiSPA Asks Haryana to Remove Upper Cap of 500 MW for Open Access Solar Projects, Dec 2018.


  39. ^ Haryana solar tender 300 mw, mercomindia.com, 4 Jan 2019.


  40. ^ Haryana Calls Developers to Set Up 16 MW of Canal Top Solar Projects, mercomindia.com, 10 January 2019.


  41. ^ ab "India's Top 10 Solar States in Charts". 2018-05-17. Retrieved 20 May 2018.


  42. ^ "India's largest floating solar power plant opens in Kerala". Retrieved 7 December 2017.


  43. ^ "Solar Projects". Welspun Renewables. Welspun Renewables., http://www.welspunenergy.com


  44. ^ Rewa Ultra Mega Solar


  45. ^ "Shirdi Gets Largest Solar Cooking System".


  46. ^ "Shirdis solar cooker finds place". 2009-07-30.


  47. ^ "Shirdi Gets worlds largest solar steam system".


  48. ^ "Reliance Power commissions world's largest Solar CSP project in Rajasthan". 12 November 2014. Retrieved 2017-03-14.


  49. ^ "Acme Solar Commissions India's Cheapest Solar Power Plant". Retrieved 29 September 2018.


  50. ^ "ACME solar tower plant". Retrieved 21 July 2018.


  51. ^ "Lowest Quoted Tariff Dips to ₹2.48/kWh in SECI's 750 MW Solar Auction for Rajasthan". Retrieved 1 March 2019.


  52. ^ "Solar power tariff plunges to record low in Tamil Nadu". Retrieved 1 July 2017.


  53. ^ "NLC biggest winner in 1,500 Megawatt Tamil Nadu solar auction". Retrieved 3 July 2017.


  54. ^ "130-MW solar power plant commissioned at Neyveli". The Hindu. Cuddalore. 2018-01-02.


  55. ^ "Telangana leaps in Solar Power generation in India - MYSUN". Rediscover the Sun with MYSUN - Solar Power Company in India. 2018-11-16. Retrieved 2018-12-05.


  56. ^ "NTPC plans 120 MW floating solar power plant". Retrieved 19 December 2018.


  57. ^ "Overview of power generation, March 2018, CEA" (PDF). Retrieved 3 April 2018.


  58. ^ ab "IEX Area prices". Retrieved 3 April 2018.


  59. ^ "Monthly solar power generation, CEA" (PDF). Retrieved 30 April 2018.


  60. ^ "Overview: Renewable energy generation, CEA" (PDF). Retrieved 30 April 2018.


  61. ^ "Gautam Adani unveils worlds largest solar power plant in Tamil Nadu". The Economic Times. 2016-09-21. Retrieved 22 September 2016.


  62. ^ "Gujarat flips switch on Asia's largest solar field, leading India's renewable energy ambitions". Washington Post. New Delhi, India. 2012-04-19.


  63. ^ "Neemuch Solar Plant inaugurated by Narendra Modi and MP CM Shivraj Singh Chauhan". Archived from the original on 7 September 2014. Retrieved 7 September 2014.


  64. ^ "Telangana gets largest solar farm in Nizamabad district - Times of India".


  65. ^ ab "NTPC solar power plants performance". Retrieved 30 April 2016.


  66. ^ "Green Energy Corp to set up 50 mw Solar Power Plant". Odisha Sun Times. Bhubaneswar, India. 2013-12-05.


  67. ^ "NTPC's 50 MW solar power plant in Madhya Pradesh commissioned". Economic Times. Retrieved 2014-09-12.


  68. ^ "Welspun Energy commissions largest solar project". Economic Times. Jaipur, India. 2013-03-12.


  69. ^ "Odisha to float tenders soon for 48 MW solar power". Business Standard. Bhubaneswar, India. 2011-12-30.


  70. ^ "Adani Group commissions largest solar power project". Economic Times. New Delhi, India. 2012-01-05.


  71. ^ "Reliance Power to Buy First Solar Panels for U.S.-Backed Project". Bloomberg. India. 2011-09-05.


  72. ^ "Industry". 2013-02-14.


  73. ^ "Welspun Renewables commissions 34 MW solar project in Punjab".


  74. ^ "Moser Baer commissions 30-MW solar farm in Gujarat". The Hindu. 2011-10-12.


  75. ^ "Akhilesh launches 30MW solar plants in Lalitpur - Times of India".


  76. ^ Tata Power commissions 25MW solar project in Gujarat


  77. ^ "GEDCOL seeks land transfer for 20 Mw solar plant". Business Standard. Bhubaneswar, India. 2014-04-01.


  78. ^ "World-Bank Backed Azure Starts Up Solar-Power Plant in India". Bloomberg. 2011-06-08.


  79. ^ Bay Area News Group, Sunday 1 January 2012; Sun-drenched India sucks up the rays, author=Vikas Bajaj


  80. ^ MW scale Grid Solar Power Plants Commissioned in India


  81. ^ Green Infra


  82. ^ Surendranagar Solar Farm


  83. ^ Waaree Energies commissions 10 MW solar power plant. Maharashtra Projects


  84. ^ http://mercomcapital.com/solar-installations-in-india-to-reach-4.8-gw-in-2016-with-a-21-gw-development-pipeline


  85. ^ "Four States Accounted for 75 Percent of India's Utility-Scale Solar Installations in 2017". 2018-03-14. Retrieved 14 March 2018.


  86. ^ Safi, Michael. "India's huge solar ambitions could push coal further into shade". The Guardian. Guardian News and Media Limited. Retrieved 30 June 2018.


  87. ^ "DOE Energy storage database". Retrieved 2017-08-21.


  88. ^ "Direct Normal Irradiance in India". Retrieved 2017-08-21.


  89. ^ "Solar Reserve awarded AU$78/MWh Concentrated Solar Power contract". Retrieved 23 August 2017.


  90. ^ "15 GW Concentrated Solar Power projects to compete for China 2nd batch pilot projects". Retrieved 9 January 2018.


  91. ^ ab "Aurora: What you should know about Port Augusta's solar power-tower". 2017-08-21. Retrieved 22 August 2017.


  92. ^ "SolarReserve receives environmental approval 390 MW solar thermal facility storage in Chile". 2017-07-19. Retrieved 29 August 2017.


  93. ^ "SolarReserve Bids 24-Hour Solar At 6.3 Cents In Chile". 2017-03-13. Retrieved 29 August 2017.


  94. ^ "Concentrating Solar Power Isn't Viable Without Storage, Say Experts". November 2016. Retrieved 29 August 2017.


  95. ^ "SB Energy and Adani Green win 840 MW at hybrid auction". Retrieved 6 December 2018.


  96. ^ "Siemens Gamesa bags Wind-Solar hybrid energy project in Karnataka". Retrieved 28 September 2017.


  97. ^ "Shapoorji Pallonji bags country's first large-scale floating solar project". Retrieved 28 November 2018.


  98. ^ "Integrated Solar-Hydro Project Takes Float". September 2017. Retrieved 1 September 2017.


  99. ^ "Cheap Baseload Solar At Copiapó Gets OK In Chile". 2015-08-25. Retrieved 1 September 2017.


  100. ^ Lewis, Dyani (2017-04-05). "Salt, silicon or graphite: energy storage goes beyond lithium ion batteries". The Guardian. Retrieved 1 September 2017.


  101. ^ "Commercializing Standalone Thermal Energy Storage". Retrieved 1 September 2017.


  102. ^ "The sleeping giant is waking up". 29 August 2017. Retrieved 31 August 2017.


  103. ^ "Solar thermal industry seeks govt attention". 2018-06-13. Retrieved 14 June 2018.


  104. ^ "Solar Water Heater". Dnaindia.com. 2009-11-28. Retrieved 2010-11-27.


  105. ^ "Solar Water Heater Rebate". The Hindu. 2009-11-26. Retrieved 2012-04-25.


  106. ^ Dipannita Das (2009-11-29). "More homes opt for solar energy". Timesofindia.indiatimes.com. Retrieved 2010-11-27.


  107. ^ "PVT panels". Retrieved 26 October 2018.


  108. ^ "DC solar products are lighting up rural India: What's driving the increased demand?". Retrieved 2017-04-15.


  109. ^ ab Roul, Avilash (2007-05-15). "India's Solar Power: Greening India's Future Energy Demand". Ecoworld.com. Retrieved 2012-02-28.


  110. ^ Upadhyay, Anindya (2015-01-03). "China's cheap solar panels cause dark spots in Indian market". The Economic Times. Retrieved 2015-01-03.


  111. ^ "Solar power in 3,000 Odisha villages by 2014". Newkerala.com. Retrieved 2010-11-27.


  112. ^ "The Orissa Renewable Energy Development Agency (OREDA) was constituted as a State Nodal agency in the 1984". Oredaorissa.com. Retrieved 2010-11-27.


  113. ^ "The Energy Business – India Energy News, Nuclear Energy News, Renewable Energy News, Oil & Gas Sector News, Power Sector News " Orissa approves nine solar power projects". Energybusiness.in. Retrieved 2010-11-27.


  114. ^ Government Provides 30% subsidy for Solar Lanterns and Home Lights


  115. ^ Action Plan to Increase Renewable Energy


  116. ^ ab "Indian Module Makers Beat Chinese Prices In 300 Megawatt Tender". 2017-10-23. Retrieved 23 October 2017.


  117. ^ Government Provides 30 per cent subsidy for Solar Lanterns and Home Lights


  118. ^ "How hot do solar panels get? Effect of temperature on solar performance". 2017-06-15. Retrieved 1 August 2018.


  119. ^ "Solar chilli drier". Informaworld.com. 2005-09-01. Retrieved 2010-11-27.


  120. ^ "Meet this engineering student from Pune who has built a solar powered bicycle". Retrieved 2017-12-27.


  121. ^ "Rain fed solar-powered water purification systems". Retrieved 21 October 2017.


  122. ^ "New rooftop solar hydro panels harvest drinking water and energy at the same time". Retrieved 2017-11-30.


  123. ^ "Inverted Umbrella Brings Clean Water & Clean Power To India". 2017-12-04. Retrieved 5 December 2017.


  124. ^ "Now, solar energy can power air conditioner, refrigerator". Retrieved 2016-03-21.


  125. ^ "Thin Film Solar PV vs Silicon Wafer – Which is Better?". Retrieved 2017-03-07.


  126. ^ "Panasonic HIT solar module achieves world's best output temperature coefficient". 2017-06-22. Retrieved 2017-06-22.


  127. ^ "The use of solar trackers is picking up fast in India". Retrieved 2016-07-07.


  128. ^ "Bifacial Plus Tracking Boosts Solar Energy Yield by 27 Percent". 2018-04-18. Retrieved 19 April 2018.


  129. ^ "Solar power essential data". Retrieved 19 October 2016.


  130. ^ Sengupta, Debjoy (2016-10-19). "Rs 3 per KWh – lowest tariff for third-party rooftop solar power installations". The Economic Times. Retrieved 2016-10-19.


  131. ^ "Giving electric vehicle batteries a second life in solar projects". 2017-02-20. Retrieved 2017-02-28.


  132. ^ "AES Energy Storage and Panasonic Target India for Grid Batteries". Retrieved 2016-04-16.


  133. ^ "Frequency Profile, NLDC, GoI". Retrieved 2015-08-06.
    [permanent dead link]



  134. ^ "India Plans 750 MW Solar Power Park With 100 MW Storage Capacity". 2016-02-25. Retrieved 2016-03-01.


  135. ^ "Real Time DSM tariff". Retrieved 2015-08-06.


  136. ^ "Deviation Settlement Mechanism and related matters, CERC, GoI" (PDF). Retrieved 2015-08-06.


  137. ^ "Rays Future Energy executes 60 MW of capacity under open access". Retrieved 2017-12-20.


  138. ^ "Audi claims to be buying batteries at ~$114/kWh for its upcoming electric cars, says CTO". 2017-06-30.


  139. ^ "Global Solar Storage Market: A Review Of 2015". 2016-04-06.


  140. ^ "Storing The Sun's Energy Just Got A Whole Lot Cheaper". Retrieved 2016-05-23.


  141. ^ "Solar and wind now the cheapest power source says Bloomberg NEF". Retrieved 19 November 2018.


  142. ^ "Energy storage already cost-competitive in commercial sector". 2017-06-30. Retrieved 2017-06-30.


  143. ^ "Construction power tariff" (PDF). 2017-10-06.


  144. ^ "Construction Site Power and Lighting". 2017-10-06.


  145. ^ "Floating solar energy transforming India into a greener nation". Retrieved 31 October 2018.


  146. ^ "Solar floats in the sunshine state". 2017-02-15. Retrieved 1 March 2017.


  147. ^ "Green Power Island: A blue battery for green energy". Retrieved July 13, 2015.


  148. ^ "NTPC installs Robotic Dry Cleaning System for Solar PV Plant at NTPC Dadri". 2017-02-23. Retrieved 25 February 2017.


  149. ^ "Some of the UK's trains could be running on solar power by 2020". Wired UK. 2017-12-06. Retrieved 6 December 2017.


  150. ^ "Review of Recent Advances in Dynamic and Omnidirectional Wireless Power Transfer" (PDF). Retrieved 7 July 2016.


  151. ^ "Indian Scientists Propose Solar Roofs For Roads". 2013-04-02. Retrieved 17 November 2015.


  152. ^ "World's First Solar Road Exceeds Expectations". Retrieved 17 November 2015.


  153. ^ "Greenhouse solar can plug the massive need for land to promote renewable energy". Retrieved 27 February 2016.


  154. ^ "In Brooklyn, you can now sell solar power to your neighbors". Retrieved 27 May 2017.


  155. ^ Sengupta, Debjoy (2016-09-19). "landed solar module prices drop 15% in three months leads to glut". The Economic Times. Retrieved 19 September 2016.


  156. ^ "Determination of Benchmark Capital Cost Norm for Solar PV power projects applicable during FY 2015-16, CERC" (PDF). Retrieved 16 July 2015.


  157. ^ Press release – 13 April 2007 (13 April 2007). "Energy (R)evolution: A sustainable Energy Outlook for India". Greenpeace.org. Retrieved 2010-11-27.


  158. ^ ab Press release – 9 April 2007 (9 April 2007). "Greenpeace announces comprehensive energy strategy for India to tackle Climate Change without compromising economic development". Greenpeace.org. Retrieved 2010-11-27.


  159. ^ "NASA population density map". Visibleearth.nasa.gov. Archived from the original on 8 June 2011. Retrieved 27 November 2010.


  160. ^ ab "Energy-Atlas Solar radiation". Retrieved 2010-11-27.


  161. ^ "Regional and World Energy-Maps of Solar radiation". Meteonorm.com. Retrieved 2010-11-27.


  162. ^ "Solar LEDs Brighten Rural India's Future". Treehugger.com. Retrieved 2010-11-27.


  163. ^ Dutt, Ram (5 September 2004). "Solar plan for Indian computers". BBC News. Retrieved 2010-11-27.


  164. ^ "Barefoot solar engineers". Worldchanging.com. 22 February 1999. Retrieved 2010-11-27.


  165. ^ "Economics of fuel cell electric vehicles and needed transport sector policy in India". Retrieved 25 November 2016.


  166. ^ Bridge to India (September 2014). "Beehives or elephants? How should India drive its solar transformation" (PDF). Bridge to India. Retrieved 2015-08-17.


  167. ^ "Will try to achieve pledged renewable energy targets in less than four and half years: Piyush Goyal". The Economic Times. 2015-11-06. Retrieved 9 November 2015.


  168. ^ Asthana, Shishir (2015-11-24). "How solar energy is changing the power sector's dynamics". Business Standard India. Retrieved 25 November 2015.


  169. ^ Chandrasekaran, Kaavya (2016-07-25). "National lab policy for renewable energy soon". The Economic Times. Retrieved 25 July 2016.


  170. ^ Prasad, Rachita (2015-11-28). "shadows of thermal power gloom loom over solar industry". The Economic Times. Retrieved 28 November 2015.


  171. ^ "Solar Energy Isn't Always as Green as You Think". 2014-11-13. Retrieved 5 November 2015.


  172. ^ "Degradation and Failure Modes". Retrieved 5 November 2015.


  173. ^ "India's booming solar sector has one major flaw: poor quality". Retrieved 2 August 2018.


  174. ^ "Draft quality control guidelines" (PDF). Retrieved 23 May 2017.


  175. ^ "Chinese solar panels to face quality control barrier". Retrieved 23 May 2017.


  176. ^ "Solar radiation measuring network in India". Retrieved 4 June 2015.


  177. ^ "Solar radiation data collection agency in India". Retrieved 4 June 2015.


  178. ^ "Solar Prices Nosedive After China Pullback Floods Global Market". Retrieved 21 June 2018.


  179. ^ "Solar Costs Are Hitting Jaw-Dropping Lows in Every Region of the World". Retrieved 28 June 2017.


  180. ^ "Solar power tariff hits a new low at Rs 3.15 levelised rate". Retrieved 2017-04-12.


  181. ^ "Solar tariffs in India have fallen by 73 percent since 2010". Retrieved 2017-03-24.


  182. ^ "Solar tariffs in India have fallen by 73% since 2010". 2017-03-24. Retrieved 2017-03-24.


  183. ^ "How Low Did It Go: 5 Lowest Solar Tariffs Quoted in 2018". Retrieved 9 January 2018.


  184. ^ "This Just Became the World's Cheapest Form of Electricity Out of Nowhere". Fortune. Retrieved 2017-02-05.


  185. ^ "Mexico's Energy Auction Just Logged the Lowest Solar Power Price on the Planet". 2017-11-21. Retrieved 2017-11-23.


  186. ^ "The Birth of a New Era in Solar PV — Record Low Cost On Saudi Solar Project Bid". 2017-10-07. Retrieved 7 October 2017.


  187. ^ "Solar power tariff dips to all-time low of Rs 4 per unit". 2016-11-08. Retrieved 10 November 2016.


  188. ^ "SECI lowers the solar tariff to INR 4.43 per unit fixed for upcoming biddings". Retrieved 2015-12-25.


  189. ^ "CERC capital cost move suggests solar tariff to fall further in FY17". Retrieved 2015-12-25.


  190. ^ "Grid Connected SPV with VGF under JNNSM" (PDF). Retrieved 2015-12-25.


  191. ^ Chandrasekaran, Kaavya (2016-05-06). "Solar auction companies seeking lowest state support to win". The Economic Times. Retrieved 2016-05-10.


  192. ^ "MNRE Amends Bidding Guidelines for Solar Projects; Reduces Commissioning Time Frame". Retrieved 11 January 2017.


  193. ^ Singh, Sarita (2017-02-10). "Solar tariffs fall to Rs. 2.97 per unit". The Economic Times. Retrieved 2017-02-11.


  194. ^ "For Rewa project, we're not interested in profits: Manu Srivastava". 2017-02-13. Retrieved 2017-02-14.


  195. ^ "Solar tariffs crash to below Rs. 3 in Madhya Pradesh auctions". Retrieved 2017-02-10.


  196. ^ "Solar power tariffs fall to new low of Rs2.62 per unit". Mint. 10 May 2017. Retrieved 11 May 2017.


  197. ^ Kumar, V Rishi (10 May 2017). "Solar power tariff bid hits new low of Rs 2.62 per unit in Bhadla park in Rajasthan". The Hindu Business Line. Retrieved 11 May 2017.


  198. ^ "Solar power tariff drops to all-time low of Rs 2.62 per unit". The Indian Express. 10 May 2017. Retrieved 11 May 2017.


  199. ^ Chandrasekaran, Kaavya (2017-05-13). "Solar power tariffs drops historic low at Rs2.44 per unit". The Economic Times. Retrieved 21 May 2017.


  200. ^ "Downing Commissions 20 MW of Open Access Solar Projects in Telangana and Andhra Pradesh". 2018-04-18. Retrieved 19 April 2018.


  201. ^ "Renewable power companies compete with thermal plants in spot market". Retrieved 17 January 2018.


  202. ^ "Developers expects solar power tariff to drop to Rs 1.5/unit". Retrieved 4 June 2017.


  203. ^ "PV Spot Price". Retrieved 18 June 2017.


  204. ^ "L1 Tariff of ₹2.71/kWh Quoted in MSEDCL's 1 GW Solar Auction". 2018-05-15. Retrieved 17 May 2018.


  205. ^ "Govt amends solar bidding norms, developers can now pass on duty hike". Retrieved 4 April 2018.


  206. ^ Chandrasekaran, Kaavya (2018-07-03). "Solar tariffs once again hit all-time low of Rs 2.44 a unit at SECI auction". The Economic Times. Retrieved 4 July 2018.


  207. ^ "Solar Tariffs in India Remain Steady at ₹2.44/kWh in SECI's 3 GW Auction". 2018-07-13. Retrieved 14 July 2018.


  208. ^ "Lowest Tariff of ₹2.55/kWh Wins SECI's 1.2 GW ISTS Solar Auction". Retrieved 26 February 2019.


  209. ^ "CleanMax Quotes L1 Tariff of ₹3.64/kWh for NREDCAP's Rooftop Solar Tender". 2018-07-24. Retrieved 26 July 2018.


  210. ^ "50 MW of Solar Projects to be Developed in Pavagada Solar Park at a Tariff of ₹1.24/kWh". Retrieved 21 February 2019.


  211. ^ "Unsubsidized wind and solar now the cheapest source for new electric-power". 2017-04-17. Retrieved 19 April 2017.


  212. ^ Jai, Shreya (2016-01-20). "Cabinet clears viability gap funding for 5,000 Mw solar power projects". Business Standard India. Retrieved 2018-06-17.


  213. ^ "India imposes safeguard duty on solar cells imports for two years". Retrieved 31 July 2018.


  214. ^ Report On Development of Conceptual Framework For Renewable Energy Certificate Mechanism for India


  215. ^ Government Incentives for Rooftop Solar Installation in India


  216. ^ "Ministry of Power Waives ISTS Charges for Wind and Solar Projects Commissioned up to 2022". 2018-02-16. Retrieved 18 February 2018.


  217. ^ "Madhya Pradesh's 35 MW Solar Rooftop Tender Sets Historic Lowest Tariff of ₹1.58/kWh". 2018-08-29. Retrieved 29 August 2018.


  218. ^ "Delhi's IPGCL Attracts Lowest Tariffs for RESCO Bids in Residential Rooftop Solar". Retrieved 20 January 2019.


  219. ^ "Solar manufacturing industry still waiting to take off". Retrieved 2016-05-17.


  220. ^ "Glass Needs for a Growing Photovoltaics Industry" (PDF). Retrieved 2015-07-29.


  221. ^ "Addressing the Challenges of RE Manufacturing in India" (PDF). Retrieved 2017-07-29.


  222. ^ "India Solar Map - 2017" (PDF). BRIDGE TO INDIA. Retrieved 30 September 2017.


  223. ^ "Solar panels score board". Retrieved 2015-11-05.


  224. ^ "Top solar panel suppliers in India - 2017". Loop Solar. Retrieved 20 September 2017.
















Retrieved from "https://en.wikipedia.org/w/index.php?title=Solar_power_in_India&oldid=885792911"





Navigation menu


























(window.RLQ=window.RLQ||).push(function(){mw.config.set({"wgPageParseReport":{"limitreport":{"cputime":"2.384","walltime":"2.625","ppvisitednodes":{"value":16062,"limit":1000000},"ppgeneratednodes":{"value":0,"limit":1500000},"postexpandincludesize":{"value":519378,"limit":2097152},"templateargumentsize":{"value":8031,"limit":2097152},"expansiondepth":{"value":17,"limit":40},"expensivefunctioncount":{"value":9,"limit":500},"unstrip-depth":{"value":1,"limit":20},"unstrip-size":{"value":609442,"limit":5000000},"entityaccesscount":{"value":2,"limit":400},"timingprofile":["100.00% 2053.794 1 -total"," 55.07% 1131.062 2 Template:Reflist"," 27.73% 569.427 153 Template:Cite_web"," 13.39% 274.985 49 Template:Cite_news"," 8.88% 182.330 2 Template:Bar_graph"," 4.95% 101.675 21 Template:INRConvert"," 4.23% 86.939 1 Template:Location_map+"," 3.66% 75.254 6 Template:Fix"," 3.51% 72.146 11 Template:Navbox"," 3.42% 70.303 51 Template:Location_map~"]},"scribunto":{"limitreport-timeusage":{"value":"1.065","limit":"10.000"},"limitreport-memusage":{"value":9838915,"limit":52428800}},"cachereport":{"origin":"mw1331","timestamp":"20190312171303","ttl":2592000,"transientcontent":false}}});mw.config.set({"wgBackendResponseTime":90,"wgHostname":"mw1331"});});

Popular posts from this blog

Human spaceflight

Can not write log (Is /dev/pts mounted?) - openpty in Ubuntu-on-Windows?

張江高科駅